Soil Resistivity Testing & Grounding System Design: Part I of II

Written by John Howard on . Posted in .

For utilities designing site-specific grounding systems, soil resistivity testing is an absolutely necessary step. Soil resistivity data is required for the ground system to meet a specific performance requirement. With resistivity data, the design becomes predictable so that you know the final ground resistance to expect after installation.

Soil resistivity testing literally collects data on how well (or how poorly) the local earth conducts electrical current. Since we expect the grounding system to dissipate electrical current to the earth, it makes sense that we would utilize resistivity data of the local soil to design the ground system that serves as the connection between both the electrical distribution system and equipment to earth.

Grounding system design has several benefits. All of them accrue from the fact that the engineering design process results in predictable grounding system performance. A major benefit is that this predictability removes the guesswork from ground system performance. You will know prior to the ground system installation what performance will be achieved. The design tells you how many electrodes should be used, where they are to be installed, how deep they must be and how large the grounding ring (if required) must be to meet the performance objective.

An effective grounding system design also avoids the unnecessary costs of overkill or having to fix/enhance the grounding system when the performance objective is not met. In our experience we have seen the extremes of both. A few years ago, an electrical contractor in Indiana (with excellent soil) installed a huge buried ring/grid of driven rods to ensure that his telecom customer did not need XIT systems. A single 10 XIT system would have met their 5Ω requirement. The cost to this customer was about 25 times higher than necessary.

The reverse situation is installing the grounding system and not meeting the performance requirement. It is always far more expensive to fix what was not done right the first time. No one would be pleased to discover that the just completed 50 X 50 foot buried ground ring did not meet the performance objective and, had it been 60 X 60 feet, the objective would have been met.

Grounding system resistance is determined by the soil resistivity and the size of the grounding system. The scientific but simple formula is R = ρ (L/A), with R representing the resistance of the grounding system, ρ the soil resistivity, L the conducting length of the path, and A the surface area of the grounding system. The formula can be simplified by dropping the L (important when considering conductors, not grounding systems), making the formula R = ρ/A.

In some situations, soil resistivity is so high that a 5Ω grounding resistance is not possible to achieve or certainly not economically feasible. When this happens, it means that ρ is so large that A cannot be made large enough to overcome the high resistivity and the grounding resistance objective R cannot be met. Even in this case, using a valid grounding system design approach demonstrates to the interested parties that the best effort has been made.

Soil resistivity is the resistance to electrical current flow across a cubic meter of earth. The current source is bonded to one square meter plates on each side. This ensures the complete volume of earth is available for the current to flow in. The unit of measure is generally ohms-meter and sometimes ohms-centimeter (ohms-meter X 100).

Resistivity is a characteristic of a material. It is measured in ohms-meters. It differs from resistance in that it is a measure of resistance per specific volume of material. Generally, the resistivity of materials does not change.

Resistance is a point-to-point measurement. For example, the resistivity of the copper material making up a 4/0 AWG conductor will remain the same along a 100-foot section. However, the resistance of the 4/0 AWG conductor when measured from one end to the 50-foot point would be one half the value when measured along the entire 100-foot section.

The first factor that determines soil resistivity is the type of soil. Generally speaking, sand and gravel conduct poorly and clays conduct well. IEEE documents show a very broad range of resistivities for a specific type of soil. For instance, clays vary from 200 to 10,000 ohms-centimeter, or a factor of 50. Limestone can vary between 500 and 400,000 ohms-centimeter or a factor of 800.

With such ranges, just knowing the soil type is not sufficient information for the design of a grounding system. The soil itself serves as the starting point for resistivity. From that point, the resistivity varies as a function of the moisture content, the electrolyte content and the temperature. In general, the more of each, the lower the resistivity will be. Each of these quickly reaches a point of diminishing returns, at which point more provides little or no additional benefit. When soil freezes, resistivity becomes exponentially higher.

Essentially, none of these factors can be changed in the field, so soil resistivity testing tells you what you need to know. It does not matter why the resistivity is what it is; it only matters that we define the number as precisely as possible.

Reaching the Water Table
Much is often made about “reaching the water table” with the grounding system. Sometimes that might improve grounding resistance and sometimes it might not. One thing is always true; you can only depend on real data provided by real testing and a design based on real data. One might spend a fortune reaching the water table and get no benefit.

Years ago, one of our customers purchased a 400-foot XIT system to reach the water table. This was a classified government project and the cost was significant. While we were not involved in the design, I suspect we would have suggested something else with an engineered design based on soil resistivity data.

Another time we were asked to analyze/test the grounding at a telehotel on the Florida coast. The local consultant had designed a ground ring of about 70 feet with several driven rods. He was convinced that it was less than 1 ohm resistance because of the “brackish” water table at five feet. We found the ground system resistance to be in the 45-50 ohm range. Soil resistivity testing showed high-resistivity soil, not good soil as the consultant thought.

We have found this situation on several occasions and believe that the brackish water is often stripped of electrolytes when filtered through the earth. Remember that distilled water has no electrolytes and therefore is very resistive. Again, this is the reason we believe in testing to define the actual resistivity.

Simple Concept
Testing to determine resistivity of the soil is a simple concept. It takes a special purpose meter, probes, hammer, coils of conductors, measuring tape and paper and pencils.

The soil resistivity test meter is known as a “4-Pole Meter” and functions as a current source. It generates enough voltage (most up to a max of 48) to generate the current the meter or operator selects. The resistance the meter sees exists in the conductors (minimal) and the probes-to-earth interface (lots).

Typically, probes are 18 inches long and made of stainless steel. Their purpose is to establish an electrical contact between the meter and earth. They allow the meter to inject the current and measure the resulting voltages. Probes are driven into the earth in a straight line, in equal spacing. Generally, we start at five feet of spacing so probes would be installed at 0, 5, 10 and 15 feet.

The meter forces current through the first probe, the earth, the last probe and back to the meter. Because the earth is semi conductive, a voltage drop develops. The meter also measures this voltage across the second and third probe. The meter then shows the amount of current flowing and the voltage that the current develops (two of the three unknowns in ohm’s law) and simply reads out the resistance in ohms.

Since the result is in ohms (a resistance) and we are looking for ohms-meter (a resistivity), a characteristic of the soil, a conversion must be performed. The following formula converts the resistance reading to ohms-meter: ρ = Probe spacing (feet) * meter reading * 1.915.

For example, if our reading was 9.80 ohms at the five feet probe spacing, then our resistivity would be 93.835 ohms-meter. An important concept to remember is that the 93.835 ohms-meter is the average resistivity between the surface and a depth of five feet (equivalent to the probe spacing).

It should also be mentioned that the testing current in all meters is a reversing DC. True DC polarizes the grounding and provides inaccurate readings. The frequency of most meters is 128 hertz. This frequency was selected because it is not a harmonic of power frequencies. The better meters have variable test frequencies so that adjustments can be made when interference is encountered.

Testing Details
As the current leaves probe number one, it forms a reverse funnel. All the current leaves the small area of the probe and immediately starts expanding, flowing through the widest cross-sectional area available (more parallel paths) before it starts “funneling” in to collect at the fourth probe on its way back to the meter. The area with the widest cross-sectional is where we want to measure the voltage drop because the current is flowing through not only the shallow earth, but also the deepest it can reach with the probe spacing being used.

Now we know the average resistivity down to five feet, but we still need a lot more information on other depths. Because a large grounding system will utilize soil at depths much greater than typical electrode depths, information much deeper than the five-foot depth needs to be known.

After performing the five-foot test, we repeat the test with probe spacing of 10, 15, 20, 30, 40, 60, 80 and out to a minimum of 100 feet. At each probe spacing we determine the average soil resistivity between the surface and a depth equivalent to the probe spacing.

One line (probe spacing of 5, 10, 15, 20, etc. feet) of testing is not enough. We prefer a minimum of three lines within the typical site. Starting in one corner, we would test down one side, then at a 45-degree angle, then at a 90-degree angle.

One reason for this test procedure is to have enough data for the prediction of grounding performance. Secondly, if a metallic pipe had been buried down one side of the site, the results will be seriously compromised on that line of testing. Remember that current will take the path inversely proportional to the impedance it sees. If a metallic pipe is available, not much current will flow through the earth that we are testing.

An important reason not yet mentioned for performing soil resistivity testing is that soil resistivity never remains consistent with depth. In our experience, the resistivity of the soil will always get either better or worse with depth. If the soil resistivity is better with depth, the ground system resistance can be improved by installing deeper electrodes. If the soil resistivity gets worse with depth, deeper electrodes will be unlikely to lower the resistance.

When designing grounding systems, soil resistivity testing is a necessity. Any design without specific soil resistivity testing is nothing more than a guess.

About the Author: John Howard, Vice President of Business Development at Lyncole XIT Grounding, has been with Lyncole since 1991. Utilizing his training in electricity and electronics, he has worked with both national and international telecommunications carriers and municipalities, developing and refining their grounding procedures, testing methods and electrical protection designs. Howard is also a frequent speaker at conferences and companies on grounding system design and proper testing.

Editor’s Note: This is the first article in a two-part series in Incident Prevention. Part 2 will focus on available options for the ground system design process and the design result.

video

IP ARTICLE VAULT 2004 - 2015

Human Performance Tools: Important or Critical?

2014 USOLN Safety Award Winners Announced

Arc Flash and the Benefits of Wearing PPE

Closing the Safety Gap

Chainsaw Safety, Planning and Precision Felling Techniques

Train the Trainer 101: Substation Entry Policies

Voice of Experience: How Does the Employer Ensure and Demonstrate?

December 2014 Q&A

December 2014 Management Toolbox

Lessons Learned, Successful Implementation of Behavioral Safety Coaching

The Pain Game: Preventing MSDs

Eliminating Excuses

Training for the New Century

Fall Protection by the Numbers

Injury Free Change

What It Takes to be a Safety and Compliance Leader

Why Single-Point Grounding Works

The Burning Question

Notes From the Underground

Leadership Influencing the Culture

Ergonomics: Preventing Injury

Taking Safety to the Next Level

4 Rules to Live By

Frostbite

A Friend in Need at Indiana Rural Electric Coops

Cleaning Rubber Goods for Safety

Lowering the Threshold

CAVE-IN! Increasing Job Site Safety & Reducing Costs

Keeping the ‘Fighter Pilots’ of Your Company Safe

Safety Comes First at SM Electric

Dramatic Results

Focusing on Safety at Comcast

When is a Lineman a Lineman?

Making Sure Everyone Goes Home Safe at Southern California Edison

Stay Alert! Work Safe!

Everyone Benefits at Charter Communications

Dissecting an OSHA Inspection

Top Five PPE Mistakes

Ultimate Protection

Learning Curve

Total Success at Dominion

NESC-2007 Update

Making Safe Choices

Tips for Improving Incident Investigation Interviews – Part 1: Preparation

The Key to Safety at KCP&L

Digging Out – The Interagency Snow Rescue Task Force

LockOut TagOut

Tips for Improving Incident Investigation Interviews- Part 2: Contact Time

Dreams Can Become Reality: SDG&E Flex Center

Bridging Communication Gaps

Equipotential Grounding at AEP

Training Development

Focusing on a Safety Culture at Consumers Energy

Substations: Eliminating the Dangers Within

Ensuring Safety at Grand Bahama Power

Perfect Storm – The Case for AED’s

Embracing Change: Think Human Performance

NESC 2007 FLAME RESISTANT CLOTHING

Managing Safety Rule Violations

Passion for Safety

How to Bulletproof Your Training

Tower Rescue Pre-planning Pays Off

Managing Safety

Effective Fall Protection for Utility Workers

Safety Information Superhighway

Inspection of Wooden Poles

Free Climbing vs. Safer Climbing

Safety Culture Success

Inspecting, Cleaning and Storing Live-Line Tools

Arc Flash – Are You in Compliance?

Human Performance

Training Second Point of Contact

Preventing Underground Damage

Keeping Things Safe in the Field and the Office

Winter Safety Vehicle Checklist

Strategies for Safety in the Wind Industry

What’s in a Number?

How to Choose and Use Ergonomic Hand Tools

Meeting the Challenge

Machine Safety

What You Need to Know About Substations

Moving from Operations into Safety or Training

Distribution Dispatcher or System Operator?

High Visibility and Arc Ratings for Flame Resistance

Stuck in the Mud

Aerial Rescue

Going With the Wind

Incident Analysis

Hidden Traps of Generator Use and Backfeed

Making the Right Choice

Soil Resistivity Testing & Grounding System Design: Part I of II

Succession Syndrome

Making Safety a Core Value

Floodwater Hazards and Precautions

Know the Signs and Symptoms of Heat-Related Illnesses

Huge Steps

Seamless and Compliant

Soil Resistivity Testing & Grounding System Design: Part II of II

Aerial Lifts

How Good Are Your Tailgates?

Root Cause Analysis

Maturity Matters

What Do We Do About Arc Hazard?

NESC-2012-Part 4: Summary of Change Proposals

A FULL Commitment

Arc Suppression Blanket Installation

What Does NFPA 70E Mean To You?

How Safe Are Your Ground Grids?

Introducing a New Certification Program for Utility Safety Professionals

Confused About Arc Flash Compliance?

Analyzing Safety and Hazards on the Job

Error-Free Performance

People Focused Safety

No Substitute

Error-Free Performance: Part II

Heard It Through the Grapevine

Best Practices

Line of Fire

Is Your Company Ready for the Next Disaster?

Preventing Employee Exposure to Pesticides

Compressed Gas Cylinder Safety

LOTO vs. Switching and Tagging

Are You on Cruise Control?

Solid Footing

Hand Protection

Crane & Derrick Compliance

Mind Control: Distractions, Stress and Your Ability to Work Safely

Rubber Insulating Line Hose

Procedure for Reducing Injuries

Huskie Tools Opens New Fiberglass Restoration Division

A92.2: The 2009 Standard

Vehicle Operation Winter Readiness

ATV Safety Begins with Proper Training

Innovate or Follow: The Argument Against A Best Practice

Northeast Utilities Takes Safety Off-Road

High-Pressure Hydraulic Injection Injuries

100 Percent Fall Protection: A Joint Union-Management Effort

Crew Foreman Needed: Who Do We Pick?

Behavior Safety: A Safety Program’s Missing Link

Challenges & Successes

Drop Zone Management: Expanding Our View of Line of Fire

Taking Stock of Your Fall Protection Compliance

Live-Line Tool Use and Care

Employee Training: How Hard Can It Be?

Supervisory Skills for Crew Leaders

Equipment: Back to Basics

A Second Look at Safety Glasses

Competition for a Cause

Human Behavior and Communication Skills for Crew Leaders

Cultivating a Mature Workforce

What’s Your Seat Belt IQ?

Substation Safety

No-Voltage Testing

Five PPE Safety Challenges

Safety Circuitry: The Power in the Brain

Arc Flash Exposure Revisited: NESC 2012 Part 4 Update

T&D Best Practices for Crew Leaders

CUSP Basics: Introduction to Human Performance Principles

Felling of Trees Near Power Lines

Working in Winter

Back to the Basics: PPE 101

Hearing Conservation: An Interesting Challenge

T&D Safety Management for Crew Leaders

Basic Qualifications of Employees

FR Layering Techniques

Safety Rules and Work Practices: Why Don’t They Match Up?

Effective Customer Relationships for Crew Leaders

The Value of Safety Certification

Safety Leadership in a Written Pre-Job Briefing

Communication: The Key to Great Safety

Safe Use of Portable Electric Tools, Cords and Generators

Keys to Effective Fall Protection

Integrity and Respect: Two of Our Most Important Tools

The Intersect: A Practical Guide to Work-Site Hazard Analysis

Strategic Safety Partners

Behavior Safety Training for Safety Committee Members

Combating Overuse and Overexertion Injuries

Safe Digging – Get the 411 on 811

Apprenticeship Training

How S.A.F.E.T.Y. Brought Bluebonnet Through the Fires

Formal vs. On-the-Job Training

That’s What I Meant to Say: Safety Leadership in Communication

The Value of Personal Protective Equipment

Safety and Human Performance: You Can’t Have One Without the Other

Oh, No! Changes in the Workplace

Performance Improvement: Barriers to Events

Train the Trainer 101: Ferroresonance Explained

Voice of Experience: Safety Excellence Equals Operational Excellence

A Mirror: Your Most Important PPE

Care of Portable Ladders

Voice of Experience: FMCSR Compliance: Driver Qualification Files

Train the Trainer 101: Enclosed Space Rescue

Keys to Evaluating and Comparing Arc-Rated and Flame-Resistant Fabrics

Raising the Bar, Lowering the EMR

How Six Sigma Can Improve Your Safety Performance

Detecting Shock Hazards at Transmission Line Work Sites

Care and Maintenance of Climbers

Voice of Experience: Are You Ready for the Big Storm?

Train the Trainer 101: Working from Crane-Mounted Baskets

Learning Leadership: The Leadership Paradigm Shift

Are You Prepared for the Next Generation of Lineworkers?

Implementing a Zero Injury Program

Public Safety and Our First Responders

Managing Cold Stress

Live-Line Work on the Jersey Shore

Soil Classification and Excavation Safety

Voice of Experience: The Definition of Personal Protective Equipment

Learning Leadership: Leadership Skill Set 1: Self-Awareness

Evaluating Crew Supervisors

Train the Trainer 101: Arc Hazard Protection

NESC and ANSI Z535 Safety Sign Standards for Electric Utility Power Plants and Substations

Working Safely with Chain Saws

The Globally Harmonized System for Classifying and Labeling Chemicals

Voice of Experience: The Cost of Business

Train the Trainer 101: Understanding Grounding for the Protection of All Employees

Learning Leadership: Leadership Skill Set 2: Self-Regulation

Occupational Dog Bite Prevention & Safety

Safety Awareness for Substations

Bighorn Sheep vs. Lineworkers: What’s the Difference?

OSHA Job Briefing Basics

Voice of Experience: Training for the Qualified Employee

Train the Trainer 101: ASTM F855 Grounding Equipment Specs Made Simple

Foundation Drilling Safety: The Aldridge Electric Story of Success

The Authority to Stop Work

Starting From the Ground Up

Understanding Step and Touch Potential

Multitasking vs. Switch-Tasking: What’s the Difference?

Voice of Experience: Incidents and the Failure to Control Work

Train the Trainer 101: Live-Line Tool Maintenance Program

Passing the CUSP Exam

Learning Leadership: Leadership Skill Set 4: Social Awareness

Ergonomics for Lineworkers

Are Your Temporary Protective Grounds Really Protecting You?

Voice of Experience: Working On or Near Exposed Energized Parts

Train the Trainer 101: Why You Need More than 1910 and 1926

Transitioning to FR Clothing

Leadership Skill Set 5: Social Persuasion

Safety Management During Change

Spice It Up!

The Singing Lineman

Emergency Action Plans for Remote Locations

Trenching and Excavations: Considerations for the Competent Person

Traffic Safety for Lineworkers

Using Best Practices to Drive Safety Culture

Voice of Experience: The Globally Harmonized System is Here

Train the Trainer 101: Grounding Trucks and Mobile Equipment

The Power of an Effective Field Observation Program

What OSHA’s Proposed Silica Rule Means to You

2013 USOLN Safety Award Winners Announced

Learning Leadership: Personal Protective Emotional Armor: Part 1

Electrical Capacitors in AC Circuits

Improving Safety Through Communication

The Benefits of The CUSP Credential

Voice of Experience: Why Did I Do That?

Train the Trainer 101: Practical Elements for Developing a Safety Culture

Learning Leadership: Personal Protective Emotional Armor: Part 2

Fact-Finding Techniques for Incident Investigations

Electrical Safety for Utility Generation Operations Personnel: A Practical Approach

Addressing Comfort and Contamination in Arc-Rated Clothing

Are You Your Brother’s Keeper?

2013 iP Safety Awards

A Key to Safety Performance Improvement

Salt River Project: Devoted to Safety Excellence

Train the Trainer 101: Safety Incentive Programs

Voice of Experience: OSHA 300 Record-Keeping Rules

Understanding and Influencing the ‘Bulletproof’ Employee

Sustaining Safety Successes

Accident Analysis Using the Multi-Employer Citation Policy

PPE: Much More Than Basic or General Protection

Voice of Experience: Understanding Enclosed and Confined Spaces

Train the Trainer 101: OSHA Forklift Certification Requirements

June 2014 Q&A

Injury Prevention Through Leadership, Employee Engagement and Analytics

NFPA 70E Arc Flash Protection for Nonexempt Industry Workers

The Final Rule

Distributed Generation Safety for Lineworkers

The Perils of Distracted Driving

August 2014 Q&A

Voice of Experience: OSHA Eye and Face Protection Standards

Train the Trainer 101: Fall Protection and the New Rule

Responding to Pole Fires

SRP Rope Access Program Addresses Towers of Power

Elements of an Effective Safety Committee

Mitigating the Risks of Aerial Patrols

Job Briefing for One

Culture Eats Programs for Breakfast

October 2014 Q&A

Voice of Experience: Flame-Resistant Apparel is Now PPE

Train the Trainer 101: Stringing in Energized Environments

The Risks and Rules of Chainsaw Operation

Behavior-Based Safety: What’s the Verdict?

Photovoltaic Solar Safety Management for Utilities

Drones and the Future of Tower Safety

Storytelling as a Management Tool

Safety and Common Sense

Snubbing to Steel Lattice Structures: Lessons Learned

February 2015 Management Toolbox

February 2015 Q&A

Voice of Experience: The Importance of Job Briefings

Train the Trainer 101: Addressing Anchorages

Recent PPE Changes and 2015 Trends

Growing a Human Performance Culture

Measuring, Planning and Cutting Methods for Chainsaw Operators

The Importance of Matching Evidence Marks in Accident Investigations

Safe By a Nose

Overhead Utility Hazards: Look Up and Live

April 2015 Management Toolbox

April 2015 Q&A

Voice of Experience: OSHA Updates to Arc-Rated FR Clothing Requirements

Train the Trainer 101: The OSHA-EEI Subpart V Settlement

The Safety Side Effect: How Good Supervisors Coincidentally Improve Safety

Facing Unique Challenges

The Roller-Coaster Life Cycle of IEEE 1307

The Power of Human Intuition

Thirty Years of Personal Perspective

The Most Important Tool on the Job Site

June 2015 Management Toolbox

June 2015 Q&A

Voice of Experience: Fundamentals of Underground Padmount Transformers

Train the Trainer 101: Back to Basics: ‘Gentlemen, This is a Football’

Arrive Alive

How to Navigate the FR Clothing Marketplace

Making the Switch

Understanding OSHA Electric Power Training Requirements

Distribution Switching Safety

Human Performance and a Rat Trap

August 2015 Management Toolbox

August 2015 Q&A

Voice of Experience: Power Generation Safety and the OSHA Update

Stringing Best Practices: Mesh Grips vs. Preforms

Understanding Safety Culture Through Perception Surveys

RF Safety for Utility Workers

2015 USOLN Safety Award Winners Announced

Train the Trainer 101: Practical Underground Safety: Handling Neutrals and Rescue

Voice of Experience: PPE Regulatory and Consensus Standard Requirements

December 2015 Q&A

December 2015 Management Toolbox

The 911 Dilemma

Spotters: A Critical Element of Site Safety

Coping With Industry Changes

The Safety Coaching Observation Process

Fundamentals of Substation Rescue Plans

Recruiting and Training the Next Generation

Shifting Your Organizational Safety Culture

Investigating Industrial Hygiene at Salt River Project

Train the Trainer 101: Practical MAD and Arc Flash Protection

Voice of Experience: Clearing Up Confusion About 1910.269

October 2015 Q&A

October 2015 Management Toolbox

N95 Filtering Face Pieces: Where Does Your Organization Stand?

Stepping Up Steel Safety Education

Rigging Fundamentals for Utilities

Arc Flash Mitigating Technologies and the OSHA Final Rule

Train the Trainer 101: Practical Personal Protective Grounding

OSHA and the Host-Contractor Relationship