Brian Erga is a distinguished Senior Member of the Institute of Electrical and Electronic Engineers (IEEE), and active member of the IEEE Engineering in the Safety, Maintenance, and Operations of Lines Subcommittee (ESMO). Mr. Erga is currently chairman of the ESMO Induction Task Force and an active member of many IEEE, ESMO, Federal OSHA, ANSI, and ASTM committees, work groups and task forces. He is an active member of the NESC-C2 Subcommittee 8, responsible for NESC Part 4 "Work Rules."

Website URL: http://www.esci.net/index.html E-mail: This e-mail address is being protected from spambots. You need JavaScript enabled to view it

Friday, 16 December 2011 16:09

Your Personal Protective Grounding Process

In prior iP articles we have discussed effective methods of applying personal protective grounding to both overhead and underground electric utility systems. Proper application of the equipotential grounding method will ensure worker protection during an accidental re-energization or backfeed of the electric utility system. But what does your personal protective grounding practice do to reduce the hazards of induction? Is it possible your personal protective grounding practice is actually increasing the effects of induction? Let’s look at what we call induction, or what electrical engineers refer to as electric field induction and magnetic field induction.

This article is a continuation of the discussion published in the August 2011 issue of Incident Prevention, which covered personal protective grounding of overhead distribution and transmission systems. As with overhead grounding, there are three industry-accepted work methods that allow qualified employees to work with de-energized underground distribution cables and equipment. They are:
• Insulation
• Isolation
• Personal protective grounding, also known as equipotential grounding or EPZ

Personal protective grounding of overhead distribution and transmission lines and equipment is one of three industry-accepted work methods that allow qualified employees to work with de-energized lines and equipment. The other two methods are insulation and isolation. Following are descriptions of all three.

The wide variety of cover-up equipment currently available to the qualified electrical worker allows energized live-line work methods to be performed safety and productively. Cover-up equipment comes in several styles and voltage ratings for use in many different live-line applications. Flexible line hose, plastic guards and covers, rubber insulating blankets and sheathing allow the qualified electrical worker to install temporary insulation between themselves and energized conductors and devices.

OSHA 1910.269(m) – “De-energizing Lines and Equipment for Employee Protection” – covers de-energizing a section of an electric utility’s transmission and distribution (T&D) system, and the transfer of that section’s control from the system operator to the employee in charge. What does that mean? Simply put, paragraph (m) covers your company’s required written T&D switching and clearance procedure.

Tuesday, 15 February 2011 13:19

The Current State of FR Clothing

The current state of FR clothing for qualified electrical workers seems to be still greatly misunderstood. However, the current FR clothing requirement is very straightforward once you decide what side of the fence you’re on – the National Electric Safety Code (NESC) or the National Fire Protection Association (NFPA).

Many questions arise in the minds of electrical workers when the discussion turns to safely operating high-voltage, gang-operated disconnect switches while standing on the ground. These questions often include:

• Should the steel operating rod connecting the switch handle to the switch have an insulator (insulated insert)?
• Should the switch handle and operating rod be grounded to a ground rod?
• Should I wear rated rubber gloves?
• Should I be standing on a ground mat?

Friday, 01 October 2010 11:49

No Difference

A tree falls through a 7.2 kV, single-phase, overhead lateral, taking the tree, the phase conductor and common neutral to the ground. The electric utility sends a crew of qualified electrical workers to the site to re-install the overhead conductors.

The crew first goes to the upstream protective device (the cutout) protecting the lateral; let’s say it is Switch #1234. The crew will most likely find the cutout door open and the fuse blown. If the utility has a system operator on duty, the designated employee (normally the lead worker of the crew) will request permission from the system operator to open the upstream cutout, if it is not already open, and request a clearance from Switch #1234 to the end of the line.

In the electric utility industry, there are several often-asked questions about FR clothing. The following questions and answers address many common concerns.

Latest Tailgate Topics


Combating Overuse and Overexertion Injuries
This month’s Tailgate focuses on what we can do to combat overuse and overexertion injuries. As every utility employee knows, our work at times is hard, dirty and dangerous. The demands of our job require much physical wo...
Safe Use of Portable Electric Tools, Cords and Generators
This month’s Tailgate is a review of some basic safety precautions to take when using portable electric tools and equipment. The focus is on prevention of electrical shock, specifically when using 120-volt AC portable ele...
Communication: The Key to Great Safety
You’re a crew leader or even a supervisor and you really know your stuff, yet your crews aren’t quite following your direction. Something is amiss, but you can’t figure it out. Or maybe you’re a journeyman lineman, ...

More iP Articles


Thermal Stress: Managing Heat Stroke & Hypothermia
While many analogies are true for the human body, of particular interest is comparing the body to a chemical reaction. All of our bodily functions are forms of chemistry. Respiration, digestion and excretion all have their ...
Aerial Rescue
The Department of Labor, Bureau of Statistics, says tower climbers have “the most dangerous job in America.” Steve Fleming, Director of Antenna & Tower Training at Safety One International (www.SafetyOneInc.com), sa...
Soil Resistivity Testing & Grounding System Design: Part I of II
For utilities designing site-specific grounding systems, soil resistivity testing is an absolutely necessary step. Soil resistivity data is required for the ground system to meet a specific performance requirement. With res...
Safety Comes First at SM Electric
"At SM Electric Co., Inc.," says Bill Hering, Corporate Safety Director, "our whole philosophy is that safety is the right thing to do for everyone. Safety issues are a top priority on every job. By the direction of our pre...
Root Cause Analysis
Even the safest among us will occasionally veer off the road to safety excellence and encounter an incident. When this happens, the best management practice is to identify and correct the cause(s) so that you can get back o...

Most Popular Articles


Incident Analysis
The essence of safety is preventing incidents from having the opportunity to occur. When they do occur, it is usually the result of one or more safety systems failures. Failures, however, are the seeds of opportunity. Incid...
Top Five PPE Mistakes
Identifying PPE Mistakes in Electric Arc Flash Programs After a decade of electric arc testing, incident investigations and incident replications using electric arcs, a few lessons have emerged as critical in assessing a ...
When is a Lineman a Lineman?
This feature's title is not a rhetorical question. There really should be an answer-a definitive, widely accepted answer we could all give quickly and consistently. There isn't and we can't, though we try with great confide...
Effective Fall Protection for Utility Workers
A review of the relevant standards and training that companies need to provide. ...

Search

Tailgate Safety

Sign Up for Tailgate Safety E-Newsletter
Sponsors are Key to the Success of Incident Prevention
DBI Sala
Glove Guard
Institute for Safety in Powerline Construction - Lineman Safety and Training
Pelsue
Utility Jobs Online